Will County Prevailing Wage for April 2006
-
Trade Name RG TYP C Base FRMAN *M-F>8 OSA OSH H/W Pensn Vac Trng
==================== == === = ====== ====== ===== === === ===== ===== ===== =====
ASBESTOS ABT-GEN ALL 30.150 30.900 1.5 1.5 2.0 6.860 3.940 0.000 0.170
ASBESTOS ABT-MEC BLD 23.300 24.800 1.5 1.5 2.0 7.860 4.910 0.000 0.000
BOILERMAKER BLD 37.700 41.090 2.0 2.0 2.0 6.720 6.790 0.000 0.210
BRICK MASON BLD 33.250 36.580 1.5 1.5 2.0 6.450 7.020 0.000 0.440
CARPENTER ALL 34.800 38.280 2.0 2.0 2.0 5.650 9.260 0.000 0.490
CEMENT MASON ALL 33.600 34.850 2.0 2.0 2.0 5.900 8.280 0.000 0.050
CERAMIC TILE FNSHER BLD 27.200 0.000 2.0 1.5 2.0 5.400 5.200 0.000 0.100
COMMUNICATION TECH BLD 29.210 30.710 1.5 1.5 2.0 7.770 8.680 0.000 0.290
ELECTRIC PWR EQMT OP ALL 34.950 40.720 1.5 1.5 2.0 7.420 8.730 0.000 0.260
ELECTRIC PWR GRNDMAN ALL 27.260 40.720 1.5 1.5 2.0 5.790 6.820 0.000 0.210
ELECTRIC PWR LINEMAN ALL 34.950 40.720 1.5 1.5 2.0 7.420 8.730 0.000 0.260
ELECTRICIAN BLD 34.500 37.610 1.5 1.5 2.0 7.920 10.53 0.000 0.350
ELEVATOR CONSTRUCTOR BLD 40.745 45.840 2.0 2.0 2.0 7.775 5.090 2.445 0.400
GLAZIER BLD 31.400 32.400 1.5 2.0 2.0 6.490 9.050 0.000 0.500
HT/FROST INSULATOR BLD 33.300 35.050 1.5 1.5 2.0 7.860 8.610 0.000 0.310
IRON WORKER ALL 30.650 31.650 2.0 2.0 2.0 7.690 13.12 0.000 0.550
LABORER ALL 30.150 30.900 1.5 1.5 2.0 6.860 3.940 0.000 0.170
LATHER ALL 34.800 38.280 2.0 2.0 2.0 5.650 9.260 0.000 0.490
MACHINIST BLD 35.630 37.630 2.0 2.0 2.0 3.880 4.750 2.460 0.000
MARBLE FINISHERS ALL 25.750 0.000 1.5 1.5 2.0 6.070 7.020 0.000 0.580
MARBLE MASON BLD 33.250 36.580 1.5 1.5 2.0 6.450 7.020 0.000 0.580
MILLWRIGHT ALL 34.800 38.280 2.0 2.0 2.0 5.650 9.260 0.000 0.490
OPERATING ENGINEER BLD 1 39.550 43.550 2.0 2.0 2.0 6.450 5.150 1.800 0.650
OPERATING ENGINEER BLD 2 38.250 43.550 2.0 2.0 2.0 6.450 5.150 1.800 0.650
OPERATING ENGINEER BLD 3 35.700 43.550 2.0 2.0 2.0 6.450 5.150 1.800 0.650
OPERATING ENGINEER BLD 4 33.950 43.550 2.0 2.0 2.0 6.450 5.150 1.800 0.650
OPERATING ENGINEER FLT 1 42.700 42.700 1.5 1.5 2.0 6.050 4.850 1.800 0.000
OPERATING ENGINEER FLT 2 41.200 42.700 1.5 1.5 2.0 6.050 4.850 1.800 0.000
OPERATING ENGINEER FLT 3 36.650 42.700 1.5 1.5 2.0 6.050 4.850 1.800 0.000
OPERATING ENGINEER FLT 4 30.500 42.700 1.5 1.5 2.0 6.050 4.850 1.800 0.000
OPERATING ENGINEER HWY 1 37.750 41.750 1.5 1.5 2.0 6.450 5.150 1.800 0.650
OPERATING ENGINEER HWY 2 37.200 41.750 1.5 1.5 2.0 6.450 5.150 1.800 0.650
OPERATING ENGINEER HWY 3 35.150 41.750 1.5 1.5 2.0 6.450 5.150 1.800 0.650
OPERATING ENGINEER HWY 4 33.750 41.750 1.5 1.5 2.0 6.450 5.150 1.800 0.650
OPERATING ENGINEER HWY 5 32.550 41.750 1.5 1.5 2.0 6.450 5.150 1.800 0.650
PAINTER ALL 33.550 37.730 1.5 1.5 2.0 5.800 5.400 0.000 0.340
PAINTER SIGNS BLD 25.150 28.240 1.5 1.5 1.5 2.600 2.010 0.000 0.000
PILEDRIVER ALL 34.800 38.280 2.0 2.0 2.0 5.650 9.260 0.000 0.490
PIPEFITTER BLD 36.100 38.100 1.5 1.5 2.0 7.910 6.100 0.000 0.800
PLASTERER BLD 32.100 33.600 1.5 1.5 2.0 6.240 6.600 0.000 0.400
PLUMBER BLD 36.000 38.000 1.5 1.5 2.0 6.000 8.000 0.000 0.610
ROOFER BLD 32.800 34.800 1.5 1.5 2.0 5.930 3.140 0.000 0.330
SHEETMETAL WORKER BLD 35.030 37.030 1.5 1.5 2.0 6.470 7.440 0.000 0.540
SPRINKLER FITTER BLD 36.000 38.000 1.5 1.5 2.0 8.000 5.600 0.000 0.500
STONE MASON BLD 33.250 36.580 1.5 1.5 2.0 6.450 7.020 0.000 0.440
TERRAZZO FINISHER BLD 27.950 0.000 1.5 1.5 2.0 6.150 5.560 0.000 0.220
TERRAZZO MASON BLD 32.050 35.050 1.5 1.5 2.0 6.150 7.140 0.000 0.120
TILE MASON BLD 33.000 37.000 2.0 1.5 2.0 5.400 6.400 0.000 0.180
TRAFFIC SAFETY WRKR HWY 22.800 24.400 1.5 1.5 2.0 3.078 1.875 0.000 0.000
TRUCK DRIVER ALL 1 32.040 32.590 1.5 1.5 2.0 5.830 3.680 0.000 0.000
TRUCK DRIVER ALL 2 32.190 32.590 1.5 1.5 2.0 5.830 3.680 0.000 0.000
TRUCK DRIVER ALL 3 32.390 32.590 1.5 1.5 2.0 5.830 3.680 0.000 0.000
TRUCK DRIVER ALL 4 32.590 32.590 1.5 1.5 2.0 5.830 3.680 0.000 0.000
TUCKPOINTER BLD 34.500 35.500 1.5 1.5 2.0 4.710 6.340 0.000 0.400
Legend: M-F>8 (Overtime is required for any hour greater than 8 worked
each day, Monday through Friday.
OSA (Overtime is required for every hour worked on Saturday)
OSH (Overtime is required for every hour worked on Sunday and Holidays)
H/W (Health & Welfare Insurance)
Pensn (Pension)
Vac (Vacation)
Trng (Training)
Explanations
-
WILL COUNTY
IRONWORKERS (SOUTH) - That part of the county South of a diagonal line
through Braidwood and Goodenow.
The following list is considered as those days for which holiday rates
of wages for work performed apply: New Years Day, Memorial/Decoration
Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day,
Christmas Day. Generally, any of these holidays which fall on a
Sunday is celebrated on the following Monday. This then makes work
performed on that Monday payable at the appropriate overtime rate for
holiday pay. Common practice in a given local may alter certain days
of celebration such as the day after Thanksgiving for Veterans Day.
If in doubt, please check with IDOL.
EXPLANATION OF CLASSES
ASBESTOS - GENERAL - removal of asbestos material/mold and hazardous
materials from any place in a building, including mechanical systems
where those mechanical systems are to be removed. This includes the
removal of asbestos materials/mold and hazardous materials from
ductwork or pipes in a building when the building is to be demolished
at the time or at some close future date.
ASBESTOS - MECHANICAL - removal of asbestos material from mechanical
systems, such as pipes, ducts, and boilers, where the mechanical
systems are to remain.
CERAMIC TILE FINISHER
The grouting, cleaning, and polishing of all classes of tile, whether
for interior or exterior purposes, all burned, glazed or unglazed
products; all composition materials, granite tiles, warning detectable
tiles, cement tiles, epoxy composite materials, pavers, glass,
mosaics, fiberglass, and all substitute materials, for tile made in
tile-like units; all mixtures in tile like form of cement, metals, and
other materials that are for and intended for use as a finished floor
surface, stair treads, promenade roofs, walks, walls, ceilings,
swimming pools, and all other places where tile is to form a finished
interior or exterior. The mixing of all setting mortars including but
not limited to thin-set mortars, epoxies, wall mud, and any other sand
and cement mixtures or adhesives when used in the preparation,
installation, repair, or maintenance of tile and/or similar materials.
The handling and unloading of all sand, cement, lime, tile, fixtures,
equipment, adhesives, or any other materials to be used in the
preparation, installation, repair, or maintenance of tile and/or
similar materials. Ceramic Tile Finishers shall fill all joints and
voids regardless of method on all tile work, particularly and
especially after installation of said tile work. Application of any
and all protective coverings to all types of tile installations
including, but not be limited to, all soap compounds, paper products,
tapes, and all polyethylene coverings, plywood, masonite, cardboard,
and any new type of products that may be used to protect tile
installations, Blastrac equipment, and all floor scarifying equipment
used in preparing floors to receive tile. The clean up and removal of
all waste and materials. All demolition of existing tile floors and
walls to be re-tiled.
COMMUNICATIONS TECHNICIAN
Installation, operation, inspection, maintenance, repair and service
of radio, television, recording, voice, sound and vision production
and reproduction, telephone and telephone interconnect, facsimile,
equipment and appliances used for domestic, commercial, educational
and entertainment purposes, pulling of wire through conduit but not
the installation of conduit.
MARBLE FINISHER
Loading and unloading trucks, distribution of all materials (all
stone, sand, etc.), stocking of floors with material, performing all
rigging for heavy work, the handling of all mateiral that may be
needed for the installation of such materials, building of
scaffolding, polishing if needed, patching, waxing of material if
damaged, pointing up, caulking, grouting and cleaning of marble,
holding water on diamond or Carborundum blade or saw for setters
cutting, use of tub saw or any other saw needed for preparation of
material, drilling of holes for wires that anchor material set by
setters, mixing up of molding plaster for installation of material,
mixing up thin set for the installation of material, mixing up of sand
to cement for the installatin of material and such other work as may
be required in helping a Marble Setter in the handling of all material
in the erection or installation of interior marble, slate, travertine,
art marble, serpentine, alberene stone, blue stone, granite and other
stones (meaning as to stone any foreign or domestic materials as are
specified and used in building interiors and experiors and customarily
known as stone in the trade), carrara, sanionyx, vitrolite and similar
opaque glass and the laying of all marble tile, terrazzo tile, slate
tile and precast tile, steps, risers treads, base, or any other
materials that may be used as substitutes for any of the
aforementioned materials and which are used on interior and experior
which sare installed in a similar manner.
TRAFFIC SAFETY - work associated with barricades, horses and drums
used to reduce lane usage on highway work, the installation and
removal of temporary lane markings, and the installation and removal
of temporary road signs.
TRUCK DRIVER - BUILDING, HEAVY AND HIGHWAY CONSTRUCTION
Class 1. Two or three Axle Trucks. A-frame Truck when used for
transportation purposes; Air Compressors and Welding Machines,
including those pulled by cars, pick-up trucks and tractors;
Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck
Washers; Carry-alls; Fork Lifts and Hoisters; Helpers; Mechanics
Helpers and Greasers; Oil Distributors 2-man operation; Pavement
Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors;
Self-propelled Chip Spreader; Skipman; Slurry Trucks, 2-man
operation; Slurry Truck Conveyor Operation, 2 or 3 man; Teamsters;
Unskilled dumpman; and Truck Drivers hauling warning lights,
barricades, and portable toilets on the job site.
Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or
Turnatrailers when pulling other than self-loading equipment or
similar equipment under 16 cubic yards; Mixer Trucks under 7 yeards;
Ready-mix Plant Hopper Operator, and Winch Trucks, 2 Axles.
Class 3. Five axle trucks; Dump Crets and Adgetors 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or
turnapulls when pulling other than self-loading equipment or similar
equipment over 16 cubic yards; Explosives and/or Fission Material
Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit;
Oil Distributors, 1-man operation; Pole Trailer, over 40 feet; Pole
and Expandable Trailers hauling material over 50 feet long; Slurry
trucks, 1-man operation; Winch trucks, 3 axles or more;
Mechanic--Truck Welder and Truck Painter.
Class 4. Six axle trucks; Dual-purpose vehicles, such as mounted
crane trucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B. and trucks with scoops on the front.
OPERATING ENGINEERS - BUILDING
Class 1. Mechanic; Asphalt Plant; Asphalt Spreader; Autograde;
Backhoes with Caisson attachment; Batch Plant; Benoto; Boiler and
Throttle Valve; Caisson Rigs; Central Redi-Mix Plant; Combination
Back Hoe Front End-loader Machine; Compressor and Throttle Valve;
Concrete Breaker (Truck Mounted); Concrete Conveyor; Concrete Paver;
Concrete Placer; Concrete Placing Boom; Concrete Pump (Truck Mounted);
Concrete Tower; Cranes, All; Cranes, Hammerhead; Cranes, (GCI and
similar Type); Creter Crane; Crusher, Stone, etc.; Derricks, All;
Derricks, Traveling; Formless Curb and Gutter Machine; Grader,
Elevating; Grouting Machines; Highlift Shovels or Front Endloader
2-1/4 yd. and over; Hoists, Elevators, outside type rack and pinion
and similar machines; Hoists, one, two and three Drum; Hoists, Two
Tugger One Floor; Hydraulic Backhoes; Hydraulic Boom Trucks; Hydro Vac
(and similar equipment); Locomotives, All; Motor Patrol; Pile Drivers
and Skid Rig; Post Hole Digger; Pre-Stress Machine; Pump Cretes Dual
Ram; Pump Cretes; Squeeze Cretes-screw Type Pumps; Raised and Blind
Hole Drill; Roto Mill Grinder; Scoops - Tractor Drawn; Slip-form
Paver; Straddle Buggies; Tournapull; Tractor with Boom and Side Boom;
Trenching Machines.
Class 2. Bobcat (over 3/4 cu. yd.); Boilers; Brick Forklift; Broom,
All Power Propelled; Bulldozers; Concrete Mixer (Two Bag and Over);
Conveyor, Portable; Forklist Trucks; Greaser Engineer; Highlift
Shovels or Front Endloaders under 2-1/4 yd.; Hoists, Automatic;
Hoists, inside Freight Elevators; Hoists, Sewer Dragging Machine;
Hoists, Tugger Single Drum; Laser Screed; Rock Drill (self-propelled);
Rock Drill (truck mounted); Rollers, All; Steam Generators; Tractors,
All; Tractor Drawn Vibratory Roller; Winch Trucks with "A" Frame.
Class 3. Air Compressor; Combination - Small Equipment Operator;
Generators; Heaters, Mechanical; Hoists, Inside Elevators - (Rheostat
Manual Controlled); Hydraulic Power Units (Pile Driving, Extracting,
and Drilling); Pumps, over 3" (1 to 3 not to exceed a total of 300
ft.); Pumps, Well Points; Welding Machines (2 through 5); Winches, 4
small Electric Drill Winches; Bobcat (up to and including 3/4 cu.
yd.).
Class 4. Bobcats and/or other Skid Steer Loaders; Oilers; and Brick
Forklift.
OPERATING ENGINEERS - FLOATING
Class 1. Craft foreman (Master Mechanic), diver/wet tender, engineer
(hydraulic dredge).
Class 2. Crane/backhoe operator, mechanic/welder, assistant engineer
(hydraulic dredge), leverman (hydraulic dredge), and diver tender.
Class 3. Deck equipment operator (machineryman), maintenance of crane
(over 50 ton capacity) or backhoe (96,000 pounds or more), tug/launch
operator, loader, dozer and like equipment on barge, breakwater wall,
slip/dock or scow, deck machinery, etc.
Class 4. Deck equipment operator (machineryman/fireman), (4 equipment
units or more) and crane maintenance 50 ton capacity and under or
backhoe weighing 96,000 pounds or less, assistant tug operator.
OPERATING ENGINEERS - HEAVY AND HIGHWAY CONSTRUCTION
Class 1. Craft Foreman; Asphalt Plant; Asphalt Heater and Planer
Combination; Asphalt Heater Scarfire; Asphalt Spreader;
Autograder/GOMACO or other similar type machines; ABG Paver; Backhoes
with Caisson attachment; Ballast Regulator; Belt Loader; Caisson Rigs;
Car Dumper; Central Redi-Mix Plant; Combination Backhoe Front
Endloader Machine, (1 cu. yd. Backhoe Bucket or over or with
attachments); Concrete Breaker (Truck Mounted): Concrete Conveyor;
Concrete Paver over 27E cu. ft.; Concrete Placer; Concrete Tube
Float; Cranes, all attachments; Cranes, Hammerhead, Linden, Peco &
Machines of a like nature; Crete Crane; Crusher, Stone, etc.;
Derricks, All; Derrick Boats; Derricks, Traveling; Dowell machine with
Air Compressor; Dredges; Field Mechanic-Welder; Formless Curb and
Gutter Machine; Gradall and Machines of a like nature; Grader,
Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form
Grader, Pull Grader, Subgrader; Guard Rail Post Driver Mounted;
Hoists, One, Two and Three Drum; Hydraulic Backhoes; Backhoes with
shear attachments; Mucking Machine; Pile Drivers and Skid Rig;
Pre-Stress Machine; Pump Cretes Dual Ram; Rock Drill - Crawler or Skid
Rig; Rock Drill - Truck Mounted; Roto Mill Grinder; Slip-Form Paver;
Soil Test Drill Rig (Truck Mounted); Straddle Buggies; Hydraulic
Telescoping Form (Tunnel); Tractor Drawn Belt Loader (with attached
pusher - two engineers); Tractor with Boom; Tractaire with
Attachments; Trenching Machine; Truck Mounted Concrete Pump with Boom;
Raised or Blind Hole; Drills (Tunnel Shaft); Underground Boring and/or
Mining Machines; Wheel Excavator; Widener (APSCO).
Class 2. Batch Plant; Bituminous Mixer; Boiler and Throttle Valve;
Bulldozers; Car Loader Trailing Conveyors; Combination Backhoe Front
Endloader Machine (less than 1 cu. yd. Backhoe Bucket or over or with
attachments); Compressor and Throttle Valve; Compressor, Common
Receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding
Machine; Concrete Mixer or Paver 7S Series to and including 27 cu.
ft.; Concrete Spreader; Concrete Curing Machine, Burlap Machine,
Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck
Cars (Haglund or Similar Type); Drills, All; Finishing Machine -
Concrete; Greaser Engineer; Highlift Shovels or Front Endloader;
Hoist - Sewer Dragging Machine; Hydraulic Boom Trucks (All
Attachments); Hydro-Blaster; All Locomotives, Dinky; Pump Cretes;
Squeeze Cretes-Screw Type Pumps, Gypsum Bulker and Pump; Roller,
Asphalt; Rotory Snow Plows; Rototiller, Seaman, etc., self-propelled;
Scoops - Tractor Drawn; Self-Propelled Compactor; Spreader - Chip -
Stone, etc.; Scraper; Scraper - Prime Mover in Tandem (Regardless of
Size); Tank Car Heater; Tractors, Push, Pulling Sheeps Foot, Disc,
Compactor, etc.; Tug Boats.
Class 3. Boilers; Brooms, All Power Propelled; Cement Supply Tender;
Compressor, Common Receiver (2); Concrete Mixer (Two Bag and Over);
Conveyor, Portable; Farm-Type Tractors Used for Mowing, Seeding,
etc.; Fireman on Boilers; Forklift Trucks; Grouting Machine; Hoists,
Automatic; Hoists, All Elevators; Hoists, Tugger Single Drum; Jeep
Diggers; Pipe Jacking Machines; Post-Hole Digger; Power Saw, Concrete
Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw
Blower; Steam Generators; Stump Machine; Winch Trucks with "A" Frame;
Work Boats; Tamper - Form-Motor Driven.
Class 4. Air Compressor; Combination - Small Equipment Operator;
Directional Boring Machine; Generators; Heaters, Mechanical; Hydraulic
Power Unit (Pile Driving, Extracting, or Drilling); Hydro-Blaster;
Light Plants, All (1 through 5); Pumps, over 3" (1 to 3 not to exceed
a total of 300 ft.); Pumps, Well Points; Tractaire; Welding Machines
(2 through 5); Winches, 4 Small Electric Drill Winches.
Class 5. Bobcats (all); Brick Forklifts; Oilers.
TERRAZZO FINISHER
The handling of sand, cement, marble chips, and all other materials
that may be used by the Mosaic Terrazzo Mechanic, and the mixing,
grinding, grouting, cleaning and sealing of all Marble, Mosaic, and
Terrazzo work, floors, base, stairs, and wainscoting by hand or
machine, and in addition, assisting and aiding Marble, Masonic, and
Terrazzo Mechanics.
Other Classifications of Work:
For definitions of classifications not otherwise set out, the
Department generally has on file such definitions which are available.
If a task to be performed is not subject to one of the classifications
of pay set out, the Department will upon being contacted state which
neighboring county has such a classification and provide such rate,
such rate being deemed to exist by reference in this document. If no
neighboring county rate applies to the task, the Department shall
undertake a special determination, such special determination being
then deemed to have existed under this determination. If a project
requires these, or any classification not listed, please contact IDOL
at 618/993-7271 for wage rates or clarifications.
LANDSCAPING
Landscaping work falls under the existing classifications for laborer,
operating engineer and truck driver. The work performed by landscape
plantsman and landscape laborer is covered by the existing
classification of laborer. The work performed by landscape operators
(regardless of equipment used or its size) is covered by the
classifications of operating engineer. The work performed by
landscape truck drivers (regardless of size of truck driven) is
covered by the classifications of truck driver.
|